Sattva Engineering Construction IPO GMP Today ₹18 Get the Latest Updates on Sattva Engineering Construction ipo Grey market premium (GMP), Kostak rate, and Subject to Sauda Price along with Expected Listing Gains. Track daily GMP trends and IPO details before investing.
Latest Sattva Engineering IPO GMP (Grey Market Premium)
Sattva Engineering Construction IPO GMP Today is – ₹18 Per Share
Kostak Rate – Not Available
Subject to Sauda – ₹22,500
Expected Listing Gain – 24.00%
Sattva Engineering Construction IPO GMP Price to Down a high to low of ₹16 Rupay on Aug 22 and a High Price of ₹18 on Aug 25, 2025 Showing Strong Market demand.
Sattva Engineering IPO GMP Live – Day-wise Trend ( Table)
GMP Date | IPO Price | GMP | Estimated Listing Price | Estimated Profit |
---|---|---|---|---|
26-08-2025 | ₹75 | ₹18 | ₹93 (24.00%) | ₹28,800 |
25-08-2025 | ₹75 | ₹18 | ₹93 (24.00%) | ₹28,800 |
24-08-2025 | ₹75 | ₹16 | ₹91 (21.33%) | ₹25,600 |
23-08-2025 | ₹75 | ₹16 | ₹91 (21.33%) | ₹25,600 |
22-08-2025 | ₹75 | ₹16 | ₹91 (21.33%) | ₹25,600 |
21-08-2025 | ₹75 | ₹0 | ₹ (0.00%) | ₹0 |
Sattva Engineering IPO Details
IPO Open Date | Aug 26, 2025 |
---|---|
IPO Close Date | Aug 29, 2025 |
IPO Price Band | ₹70 to ₹75 per share |
Face Value | ₹10 per equity share |
Lot Size | 1,600 Shares |
Minimum Investment | ₹1,20,000 Lakhs (for 1 lot at ₹75) |
Issue Type | Fresh Issue |
Total Issue Size | 47,16,800 shares (Approx ₹35.38 Cr) |
Market Maker | 2,40,000 shares (Approx ₹1.80 Cr) |
Issue Type | Bookbuilding IPO |
QIB Quota | 50.00% |
Retail Investor Quota | 35.00% |
NII (HNI) Quota | 15.00% |
Listing Exchange | NSE SME |
Anchor Investor List | Click Here |
DRHP (Draft Prospectus) | Click Here |
RHP (Final Prospectus) | Click Here |
About Sattva Engineering Limited
Our Company was originally incorporated on d December 21, 2005 “Sattva Engineering Construction Limited” engineering, procurement and construction (“EPC”) company engaged in the business of providing water resource management solutions which includes the Water Supply Scheme (“WSS”) with underground and overhead tank, Under Ground Sewerage System (“UGSS”), Sewage Treatment Plants (“STP”) and Water Treatment Plants (“WTP”) primarily for government authorities/bodies.
We also offer operation and maintenance services for the STP projects as a part of the EPC contract.
we design and construct large underground and overhead water tanks for storage and supply of potable/drinking water along with pump house, laying the pipeline from the water tank and achieving house service connections including electromechanical works.
Also Read: Sattva Engineering Construction IPO 2025, Date, GMP, Price, Allotment, Review & Listing
FAQs ON Sattva Engineering Construction IPO GMP Today
Q1: What is Sattva Engineering Construction IPO GMP today?
Sattva Engineering Construction IPO GMP Price is ₹18 Per Share
Q2: What is the Kostak Rate today?
Sattva Engineering Construction IPO Kostak Rate is ₹- as of today Not available.
Q3: Sattva Engineering Construction ipo gmp investorgain?
Sattva Engineering Construction ipo gmp Price investorgain is ₹17 rupay Righ Now
Q4: Sattva Engineering Construction ipo gmp ipowatch?
Sattva Engineering Construction ipo gmp ipowatch Price is ₹15 rupay Righ Now
Q5: What is the Subject to Sauda rate?
Sattva Engineering Construction IPO Subject to Sauda is ₹22,500 as of today.
Q6: What are the expected listing gains?
Sattva Engineering Construction IPO Estimated 24.00% returns based on current GMP
Disclaimer:
IPO GMP (Grey Market Premium), Kostak and Subject to Sauda Rates are Unofficial and Can Change Quickly.
We do Not BUY or SELL IPO Forms.
Do Not apply For IPOs Based only on GMP Price.
Always Review the company’s fundamentals before investing.